TIMBER SQUARE Contractor: Mace Value: £6.6m Core drilling Builders work Holes Breaking out Temporary road surface Breaking out localised existing Slabs Concrete Encasement Structural Concrete Repair Cosmetic Concrete Repair 80% of the former Print building’s original structure was retained. 115 tonnes of reused steel saved 276 tonnes of CO2 (equal to 47 trips around the world!). Hybrid CLT frame reduced embodied carbon by 75%, saving 6,250 tonnes of CO2