Women in Construction Week! For Women in Construction Week, we caught up with the team on our Data Centre and Substation project to see this year’s theme “Level Up, Build Strong” in action. From the 30,000m³ basement excavation, piling, and enabling works to the full concrete package, including raft slabs, basement walls, and SR2 finishes, this project covers a large scope of works. With Aoife O’Neill driving the engineering on-site and Rachel Corcoran putting in the hours for her MSc in Quantity Surveying, the standard is being set high.