27 BATHURST MEWS, LONDON W2 Contract: JCT Building Contract with Contractor’s Design (ICD) 2005 Value: £270,000 Duration: 17 weeks Completed: August 2009 Project Manager/Cost Consultant: Cluttons LLP Structural Engineer: Michael Aubrey Partnership “We looked for a contractor where a high proportion of their work is repeat business, a team with exibility and an approach of getting the job done. J Coffey Construction provide a level of performance unrivalled by many competitors.” Church Commissioners for England. The refurbishment of a vacant property to create a high quality two bedroom mews house. The works included the renewal of the external windows and doors and an entire new roof structure and conservation rooflights. The internal remodelling included the introduction of structural steelwork supports throughout. A new staircase framed in hardwood with glazed balustrades was formed and the refurbishment introduced a bespoke kitchen and 2 en-suite facilities with high quality sanitaryware fittings and extensive timber flooring and stonework finishes throughout. A heat recovery unit was installed to aid internal ambient comfort and an internal lightwell created from the roof level to create internal light to the rear of the ground oor.