40 LEADENHALL Contractor:Mace Architect: Make Value: £4m Engineer: WSP Strengthening to the existing steel frame. Design and installation of the temporary works. Formation of new stair openings through a metal decking concrete slab. Removal and reinstatement of the intumescent coatings. Steel to steel connections design.