BEACONSFIELD

Client: Balfour Beatty
Value: £1m
Location: Beaconsfield
Duration: 6 months

The construction of the Eastern Relief Road at Beaconsfield included 1km of new road construction and roundabout to take traffic off the existing A355. Alterations and improvements to the existing road and new road layout including drainage system, street lighting and footpath construction. A phased delivery approach was used for the local traffic access to residential roads and driveways.

All earthworks including drainage dig were done with GPS guided excavators and dozers which eliminated any over dig and minimised the need for Engineers setting out in the proximity of plant on a daily basis.