BILLITER STREET

Contractor: Mace               Architect: Make

Value: £4.2m                        Engineer: WSP

  • Soft strip and lift removal while retaining the listed items within the Grade          2 listed building
  • Notifiable and non-notifiable asbestos removal
  • Design and installation of a CAT 2 façade retaining temporary works                       system including the manual of installation of 70t of steelwork
  • Demolition of the existing roof, the South and East facades and floorplates         between Level 4 to  Ground Floor
  • Installation of underpinning, lift pits and capping beams ahead of the                   rebuild of the permanent structure
  • Formation of a twin RC lift shaft from Basement to Level 4 using the Peri            DUO System Formwork
  • Installation of a new steel frame to the South and East façades from                    basement to Level 5
  • Installation of timber bays and composite slabs to the new steel frame
  • Timber installation to strengthen the existing structure throughout
  • Drainage installation throughout the Basement
  • Brickwork repairs and the installation of the Helifix repair system                          throughout the building
  • Formation of builderswork openings through structural walls across the              basement
  • Structural waterproof tanking to the basement slab and walls
  • Installation of RC upstands to riser openings
  • Installation of GRP riser flooring from Ground Floor to Level 4