DLR – ROYAL MINT GARDENS

Client: IJM

Value: £8.8m

• Full electrical and mechanical installation along the full length of the 150m       tunnel.
• Fire Main installed along the 150m Tunnel.
• Two escape routes along the North and South of the encapsulation with a           steel framed walkway with phenolic walkway and GRP handrail.
• 100m of Pre-cast plank installation with structural slab topping.
• Western escape route construction: Steel sheet pile temporary works shaft       installed and within these the western stair core and stairs installed.
• Fit out Western escape stairs E&M and all first and second fix items.
• Install E&M Plant room for all E&M control gear.
• Install 2 smoke extract fans under the E&M Plant room and all extraction           ductwork from western escape stairs.
• Western and Eastern Barrow crossings installed for services to cross the              tracks.
• Western escape stairs breakthrough.