WESTFIELD

Contractor:Westfield                Architect: MPN

Value: £3m                                   Engineer: MPN

  • Design: Steelwork & Temporary Works by in-house design team.
  • Column Strengthening works
  • Demolition works
  • New Steelwork to newly formed openings
  • New Galvanised Steel plant deck and roof stubs in excess of 40 tonne.
  • Blockwork
  • GRP and secondary steelwork installation to existing risers
  • Strip out works
  • Diamond Core Drilling
  • Firestopping
  • Floor saw cutting
  • Permanent Waterproofing