Project Category: Infrastructure

CROSSRAIL – WEST DRAYTON STATION

Contractor: Hochtief  Value: £1.7m Groundworks • Pile excavation and breakdown for northern staircase and footbridge. • Excavation, temporary works, and reinforced concrete works for lift pit,           … Read more »

TFL OLD STREET ROUNDABOUT

Client: Morgan Sindall Value: £3.9m Location: Old Street Duration: Ongoing At Old Street roundabout, we are carrying out works to the station entrances and traffic islands. This includes the excavation… Read more »

STOKE GIFFORD

Client: Volker Fitzpatrick Value: £1.9m Location: Stoke Gifford Bristol Duration: 32 weeks Extensive civils works were carried out to provide 300,000 litres of additional fuel storage capacity at Stoke Gifford… Read more »

TFL HIGHWAYS

Client: Hochtief Value: £1.6m Location: Highbury Corner Duration: 6 months At Highbury Corner, Islington a challenging project in terms of live traffic, logistics and rail environment was undertaken in compliance… Read more »

CROSSRAIL WESTERN STATIONS

Client: Vinci Construction UK Value: £2.9m Location: Ealing Broadway, Hanwell, Southall and Iver Duration: 16 months This civil engineering package was part of the Crossrail West Station Upgrade Works at… Read more »

READING STATION RENEWAL

Client: Costain Hochtief                    Value: £6m                                 … Read more »

DLR – ROYAL MINT GARDENS

Client: IJM Value: £8.8m • Full electrical and mechanical installation along the full length of the 150m       tunnel. • Fire Main installed along the 150m Tunnel. • Two… Read more »

BEACONSFIELD

Client: Balfour Beatty Value: £1m Location: Beaconsfield Duration: 6 months The construction of the Eastern Relief Road at Beaconsfield included 1km of new road construction and roundabout to take traffic… Read more »